Skip to content

ZLD & MLD studies

Studies that scope Zero Liquid Discharge or Minimum Liquid Discharge for a site — eliminating or minimising the liquid effluent leaving the plant. Delivered as a process flow diagram, technology selection, equipment selection and a capex/opex budget, so the cost of going to zero (or most of the way there) is known before it's committed to.

What MAM delivers

  • Effluent stream characterisation, including seasonal and campaign variation
  • Concentration and volume-reduction train design (RO, evaporation, crystallisation as required)
  • Process flow diagram from effluent source to solid residue or reject reuse
  • Technology and equipment selection sized to the reduction target
  • Capex and opex budget, including the energy cost of thermal steps

Study deliverables

DeliverableScope
Process flow diagramMapped unit operations from source stream to the target endpoint
Technology selectionTreatment technologies matched to feed characteristics and target quality
Equipment selectionSized equipment list against the selected process train
Capex / opex budgetIndicative capital and operating cost envelope

ZLD and MLD are not the same commitment. Zero Liquid Discharge removes essentially all liquid effluent, usually ending in a crystalliser or evaporation pond and a solid residue for disposal — expensive to run, mainly on energy. Minimum Liquid Discharge stops short of zero, pushing recovery as high as the economics support and accepting a smaller, more concentrated reject stream. The study exists to show which one the site's economics actually justify, not to default to the more dramatic-sounding option.