Wastewater management

The treatment train and controls that take a site's wastewater from generation to a compliant discharge, reuse point, or minimal-liquid endpoint — the biological and physicochemical treatment itself, not the discharge permit paperwork.

Design parameters
ParameterValue
Typical capacity rangeFrom single-stream package plants under 100 m³/day to multi-stream industrial trains above 5,000 m³/day
Pre-treatment approachScreening and equalisation ahead of biological or physicochemical treatment, sized to flow and load variability rather than average flow alone
Achievable reductionCOD/BOD reduction typically 85-95% through combined physicochemical and biological stages, depending on influent load
Egyptian effluent challengeBatch or campaign-driven production creates hydraulic and organic load spikes that a steady-state design undersizes for
Design responseEqualisation sized to the actual production schedule, not a generic multiple of average flow, with buffer capacity built into dosing systems for load spikes

The design failure mode here is rarely the biology itself — it's sizing equalisation to an average daily flow figure on a site that actually runs in three-shift campaigns with idle weekends. The tank that smooths that variation is usually the cheapest fix and the first one skipped.